Projects

Installed on plants that cannot afford a containment failure

Desalination, power generation, petrochemical, rail and marine. Each project below lists the systems supplied and the conditions they were specified against.

17
Published reference projects
6
Sectors, from desalination to data centre
10
Countries across the region

All projects

17 of 17 projects
Sector

Rail Transport

LRT 3

Light rail

Location
Malaysia

What each sector asks of us

Oil & gas

Long spans, heavy cable fills and a corrosion regime that rules out anything but HDG or 316L. Load cases are checked before the quote goes out.

Power generation

Support spacing set by the steel, not the ladder. We publish SWL at 3, 4.5 and 6 m so the structural engineer can size once.

Water treatment

Permanently humid, often chlorinated. Stainless in the process halls, galvanised above — spliced at the zone boundary with matched geometry.

Rail & transit

Fire and smoke requirements, plus tight tunnel envelopes. Medium-duty ladder with shallow rails and no protruding edges.

Marine & offshore

All-welded stainless, pickled and passivated after fabrication, with EN 10204 3.1 certificates against each heat number.

Data centres

Routes change through construction. Perforated side rails let supports and cleats land anywhere without site drilling.

Specifying containment for a project like these?

Send us the route drawings and the environment. We'll come back with a system, a load case and a price.

Chat on WhatsApp