Hong Kong · 2020

Black Point Power Station, Hong Kong

Cable tray, cable ladder and channel support framing supplied to Siemens

Array Metal supplied cable tray, cable ladder and channel support framing to Siemens for Black Point Power Station, the gas-fired power station at Tuen Mun in Hong Kong.

Cable tray and ladder on site

Perforated cable tray runs in stacked tiers on channel posts and cantilever arms, with bolted covers over the exposed runs. Inside the building, cable ladder is carried on braced channel frames, with factory-made bends turning the routes overhead.

Before delivery, the order was load-tested and inspected at our factory. Photos from that inspection are shown below.

Client
Siemens
Location
Hong Kong
Year
2020
Sector
Energy

Factory inspection

4 September 2017

Before delivery, the order was inspected at our factory. The inspection covered a load test, a dimensional check and a galvanising thickness check.

01

Load test

A length of cable tray was placed on two supports and loaded with steel bundles that had been weighed on the factory scale.

Deflection was measured at midspan with the load in place. The test was then repeated with a heavier load.

Weighing the test load
Measuring deflection at midspan
Weighing the second load
Second load on the tray

02

Dimensional check

Tray, ladder, channel and fittings were measured against the drawings. Width and depth were checked with a tape, and material thickness with digital callipers.

Tray width
Tray base thickness
Side rail thickness
Tray depth
Support plate
Cable ladder

03

Galvanising thickness check

The zinc coating thickness was measured with a coating thickness gauge on tray, channel and fittings.

Cable tray
Tray base
Channel